(1)桥梁护栏预制场地应平整、坚实、干净,应采取排水措施,防止现场沉降。每个预制件应一次完成而不中断。当浇注预制件时,应使用刚性护栏。

(2)桥梁护栏当混凝土采用水平重叠法浇筑时,应在下部构件顶部设置临时隔离层,仅在下层混凝土强度达到5 MPa后才能浇注上部构件。

(3)在空心板管形式周围浇筑混凝土时,应采取措施防止管材移位,应特别注意防止管体浮起。桥梁护栏混凝土应浇筑两层。底部应浇注到管模具的中心,并振动沉积。然后,在下层混凝土足够塑性的情况下,应尽快浇筑上层。上层混凝土应采用振动器与下层混凝土相结合。

(4)在腹板底部扩大截面的T形和I形梁应加宽,然后倒腹板和凸缘板。

(5)预制件底部护栏应按图纸要求安装。预应力混凝土梁板应根据图纸提供的理论拱度值和实际施工情况,正确预测梁拱的变化,并采取相应的措施。如果预应力后张法预应力混凝土的拱度大,则应考虑在预制桥台上安装反拱。当梁的实际弯度较大时,会影响混凝土桥面的施工,应向监理工程师书面报告,会同设计单位协商解决。

(6)U梁或拱肋可一次或两次浇注。在一次浇筑中,浇筑底部支承的底部和顶部,然后在上述混凝土固结后浇注腹板。浇筑两次时,先将底板浇注到支承板顶部,然后根据施工缝浇注腹板混凝土。

(7)箱梁桥梁护栏的浇筑应先倒在地板上,振动压实,然后倒在腹板上。腹板的浇注可以分段进行,也可以从一端到另一端进行,夯实。箱梁浇筑应采取必要措施拆除箱梁护栏。

(8)所有预制件均应按照图纸准确嵌入,不得遗漏。

桥梁护栏就选杭州楷高实业有限公司。批发的价格,让您省钱;品牌的质量,让您省心。

l2-1G221155Q4-50_350_240[1].jpg

(1) Bridge guardrail prefabrication site shall be level, solid and clean, and drainage measures shall be taken to prevent settlement on site. Each preform shall be completed at one time without interruption. Rigid guardrails shall be used when casting prefabricated parts.
(2) When the concrete of bridge guardrail is poured by horizontal overlapping method, a temporary isolation layer shall be set on the top of the lower member, and the upper member can only be poured after the strength of the lower concrete reaches 5 MPa.
(3) When pouring concrete around the hollow slab pipe form, measures should be taken to prevent the pipe from shifting, and special attention should be paid to prevent the pipe from floating up. Two layers of bridge guardrail concrete shall be poured. The bottom shall be poured into the center of the pipe mold and vibrated for deposition. Then, if the concrete in the lower layer is plastic enough, the upper layer should be poured as soon as possible. The upper concrete shall be combined with the lower concrete by vibrators.
(4) T-shaped and I-shaped beams with enlarged section at the bottom of the web plate shall be widened, and then the web plate and flange plate shall be inverted.
(5) The guardrail at the bottom of prefabricated parts shall be installed according to the drawing requirements. Prestressed concrete beams and slabs shall correctly predict the changes of beam arches and take corresponding measures according to the theoretical camber values provided in the drawings and the actual construction conditions. If the camber of pre-stressed post-tensioned pre-stressed concrete is large, the installation of reverse arch on the precast bridge deck should be considered. When the actual bending degree of the beam is large, it will affect the construction of the concrete bridge deck, and a written report shall be submitted to the supervision engineer, which shall be settled through consultation with the design unit.
(6)U beam or arch rib can be poured once or twice. In one casting, the bottom and top of the bottom support are first cast, and then the web is cast after the above concrete is consolidated. When pouring twice, the bottom plate shall be poured to the top of the support plate first, and then the web plate concrete shall be poured according to the construction joints.
(7) The pouring of box girder bridge guardrail shall be first poured on the floor, vibrated and compacted, and then poured on the web plate. The casting of the web plate can be carried out in sections or from one end to the other end for compaction. Necessary measures shall be taken to dismantle box girder guardrail during box girder casting.
(8) All prefabricated parts shall be accurately embedded according to the drawings and shall not be omitted.
Hangzhou kaigao industrial co., ltd. was chosen as the bridge guardrail. Wholesale prices will save you money. The quality of the brand, let you worry.


  • 联系我们
  • 杭州楷高实业有限公司
  • 地址:杭州市萧山区义蓬街道春雷村
  • 电话:0571-82182933
  • 手机:18805713253/17767072188
  • 联系人:高经理
  • QQ:510721032